Melbourne has a well-established pool building industry, with licensed builders operating across the metro area and outer suburbs. Companies such as Mayfair Pools, Aqua Technics, Paramount Pools, Narellan Pools, and Blue Haven Pools all have a presence in Melbourne and can handle projects from basic lap pools to fully tiled leisure pools with integrated spa sections. Costs typically range from $35,000 for a straightforward fibreglass installation to $120,000 or more for a custom concrete pool with landscaping.
Fibreglass vs Concrete: What Melbourne Builders Offer
Most Melbourne pool builders work with either fibreglass shells or concrete (also called gunite or shotcrete). Fibreglass pools are factory-moulded and craned into an excavated site, which keeps installation time to around 2–6 weeks. Concrete pools are built on-site and allow fully custom shapes, but the build process takes 3–5 months and requires more ongoing maintenance. Several builders, including Narellan Pools and Aqua Technics, specialise primarily in fibreglass. Companies such as Mayfair Pools and Goodall Pools and Spas have strong reputations for concrete work in Melbourne’s middle and outer suburbs.
What to Check Before Signing a Contract
All pool builders in Victoria must hold a current Domestic Builder (Unlimited) or Domestic Builder (Limited) registration with the Victorian Building Authority (VBA). You can verify any builder’s licence at vba.vic.gov.au before committing. Pools valued over $16,000 also require domestic building insurance, which the builder must arrange before taking your deposit.
Get at least three quotes and confirm that each quote includes excavation, fencing (mandatory under Australian Standard AS 1926 for any pool with water depth over 300mm), filtration equipment, and site preparation. Fencing alone can add $4,000–$10,000 depending on the perimeter and material chosen.
Check whether the builder uses a Master Builders Association or Swimming Pool and Spa Association (SPASA) member status, as SPASA members agree to a code of conduct and dispute resolution process. SPASA Victoria runs a Find a Member directory on its website.
Timelines and Council Permits in Melbourne
A building permit is required for all in-ground pools in Victoria. Most Melbourne councils process pool permit applications within 10–30 business days, though this varies. Some councils in Melbourne’s outer growth corridors, including Casey and Cardinia, can take longer due to volume. Your builder typically manages the permit application as part of the contract, but confirm this in writing. Pool fencing inspections are separate from the pool build inspection and must be completed before the pool is filled.

Frequently Asked Questions
How long does it take to build a pool in Melbourne?
A fibreglass pool typically takes 4–8 weeks from excavation to water-fill, once permits are in place. A concrete pool takes 3–5 months. Factor in an additional 4–10 weeks for the permit approval process before any ground is broken.
What does a pool in Melbourne cost in 2024?
Entry-level fibreglass pools start around $35,000–$50,000 installed. Mid-range concrete pools with tiling and basic landscaping sit between $70,000 and $100,000. Fully custom pools with water features, heating, and automation can exceed $150,000.
Do I need council approval for a pool in Melbourne?
Yes. All in-ground pools in Victoria require a building permit issued through your local council or a registered building surveyor. Above-ground pools over 300mm depth also require compliant fencing, though a full building permit may not always apply. Check with your local council directly, as requirements vary.